EasyManuals Logo

Veeder-Root TLS-350 System Setup Manual

Veeder-Root TLS-350
227 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #153 background imageLoading...
Page #153 background image
12-7
12 Volumetric Line Leak Detection Last Annual Test Passed
Last Annual Test Passed
If necessary, press STEP until you see the message:
Use this display to enter the date of the last annual test passed.
NOTE: This message only appears if “Annual Warning” was enabled in System Setup.
To enter the date of the last annual test passed, press CHANGE and enter the date. Press ENTER to confirm your
entry:
Setting Up Additional Line Leak Detectors
If you have additional Line Leak Detectors to set up, press STEP to return to the ENTER PIPE LABEL message:
Press TANK/SENSOR to access a new Line Leak Detector. Repeat the steps described above beginning with
“Pipe Label and Tank Identification” on page 12-1.
If you have entered setup information for all Volumetric Line Leak Detectors in the system, press FUNCTION to
exit.
LAST ANNUAL TEST PASSED
DATE: XX/XX/XXXX
DATE: XX/XX/XXXX
PRESS <STEP> TO CONTINUE
ENTER PIPE LABEL
P#:

Table of Contents

Other manuals for Veeder-Root TLS-350

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Veeder-Root TLS-350 and is the answer not in the manual?

Veeder-Root TLS-350 Specifications

General IconGeneral
ModelTLS-350
ManufacturerVeeder-Root
ApplicationFuel management
Product TypeTank gauge
FunctionalityMonitors fuel levels
CommunicationRS-232
DisplayLCD
Environmental ProtectionNEMA 4X

Related product manuals