Figure 3.1 Remove the mounting brackets
ITEM DESCRIPTION
1 Mounting bracket (one on each side)
2 Mounting bolts (4 places, 2 each side)
4. Raise the 4leveling feet to provide clearance between the pallet and the UPS frame.
5. Connect the ramp to the UPS pallet as shown in Figure 3.2 below, and roll the UPS slowly down
the ramp until it is on a level surface.
Figure 3.2 Connect the ramp and roll UPS off the pallet
3.5 Installing the UPS
The Liebert APS may be installed as a tower or in a rack, depending on available space and use
considerations. Determine the type of installation and follow the appropriate instructions. See Tower
Installation on page 25 or Rack Installation on page 26.
Vertiv | Liebert® APS™ Installer/User Guide | 24