USER MANUAL-S600E
75
S600E
Figure 7-2 Parallel signal cable connections (Parallel system)
7.3
Operating Procedures for Parallel Systems
Proceed one step at a time, and only move on to the next time when the current operation has been completed for
all the UPS modules in the system.
Start-up Procedures In Normal Mode
These procedures are used to start the UPS starting from the fully switched off condition, which means that neither
the UPS or the maintenance bypass switch have supplied power to the load before. Make sure UPS has been
completely installed and commissioned by the engineer, and the external power supply switch is in the off position
Note
Warning