EasyManua.ls Logo

VICI DBS PG Plus Rack 100 - Maintenance; Routine Maintenance Hydrogen Part; Routine Maintenance Zero Air Part

VICI DBS PG Plus Rack 100
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
PG PLUS RACK + ZERO AIR
& GC PLUS RACK USER MANUAL
www.vicidbs.com
Version 2.00.0000
11. MAINTENANCE
With proper care and maintenance, your hydrogen generator should provide you with years of trouble-free
operation. There are no adjustments to be made to the generator. The only routine service operations are
those described below.
Nonetheless, the generator should be inspected approximately every 2 years. Contact your supplier.
11.1. ROUTINE MAINTENANCE HYDROGEN PART
The following section describes the maintenance operations required for the correct operation of the
hydrogen generator.
The routine maintenance consists of:
Fill the external water tank with distilled or deionized water
Replace the deionization bag every 6 months or earlier if required
Replace the water lter (inside the external tank) every 3 years
PART NUMBER DESCRIPTION
DB-H200-031 Deionizer bags (pack of 2)
DB-10429 3-year maintenance kit for PG Rack/FID-T/FID-S without air lter, contains:
Deionizer LE bag (pack of 2)
Perma pure dryer tubing (2)
Filter element
GLS service kit
Water pump circulation
DB-10284 3-year maintenance kit for PG Rack/FID-T/FID-S with air lter, contains:
Deionizer LE bag (pack of 2)
Perma pure dryer tubing (2)
Filter element
GLS service kit
Circulation pump
Replacement cartridge for coalescent lter
11.2. ROUTINE MAINTENANCE ZERO AIR
WARNING: Before service is performed, make sure that the system shut down has
been performed according to instructions above.
1. Supply air pressure has been shut off with an in-line valve.
2. Line pressure has been released with an in-line relief valve.
3. Unit has been shut-off and isolated from electrical power.

Table of Contents

Related product manuals