39
PG PLUS RACK + ZERO AIR
& GC PLUS RACK USER MANUAL
www.vicidbs.com
Version 2.00.0000
11. MAINTENANCE
With proper care and maintenance, your hydrogen generator should provide you with years of trouble-free
operation. There are no adjustments to be made to the generator. The only routine service operations are
those described below.
Nonetheless, the generator should be inspected approximately every 2 years. Contact your supplier.
11.1. ROUTINE MAINTENANCE HYDROGEN PART
The following section describes the maintenance operations required for the correct operation of the
hydrogen generator.
The routine maintenance consists of:
• Fill the external water tank with distilled or deionized water
• Replace the deionization bag every 6 months or earlier if required
• Replace the water lter (inside the external tank) every 3 years
PART NUMBER DESCRIPTION
DB-H200-031 Deionizer bags (pack of 2)
DB-10429 3-year maintenance kit for PG Rack/FID-T/FID-S without air lter, contains:
• Deionizer LE bag (pack of 2)
• Perma pure dryer tubing (2)
• Filter element
• GLS service kit
• Water pump circulation
DB-10284 3-year maintenance kit for PG Rack/FID-T/FID-S with air lter, contains:
• Deionizer LE bag (pack of 2)
• Perma pure dryer tubing (2)
• Filter element
• GLS service kit
• Circulation pump
• Replacement cartridge for coalescent lter
11.2. ROUTINE MAINTENANCE ZERO AIR
WARNING: Before service is performed, make sure that the system shut down has
been performed according to instructions above.
1. Supply air pressure has been shut off with an in-line valve.
2. Line pressure has been released with an in-line relief valve.
3. Unit has been shut-off and isolated from electrical power.