EasyManua.ls Logo

Viessmann GC1 - Introductory Information; Commissioning

Viessmann GC1
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
The commissioning and matching of the
control unit to local conditions and build-
ing characteristics, as well as instructing
the user in the operation of the system,
must be carried out by your heating con-
tractor.
As the user of new combustion equip-
ment, you may be obliged to notify your
local flue gas inspector of the installation
[check local regulations]. Your local flue
gas inspector will also inform you [where
appropriate] about work he may be
required to perform on your combustion
equipment (e.g. regular checks, clean-
ing).
Your system is preset at the factory
The control units are factory-set for cen-
tral heating and DHW heating:
Vitotronic 100:
" "
Vitotronic 300-K:
"Heating and DHW"
Your heating system is therefore ready
for use.
Central heating
Between 6:00 and 22:00 h, the rooms
are heated to 20 °C "Set room tem-
perature" (standard heating mode).
Between 22:00 and 6:00 h, the rooms
are heated to 3 °C "Set reduced room
temp" (reduced heating mode, frost
protection).
Your heating contractor can make fur-
ther settings for you during commis-
sioning.
You can change any settings individu-
ally at any time to suit your require-
ments (see chapter "Central heating").
DHW heating
Between 5:30 and 22:00 h, the DHW
is heated to 50 °C "Set DHW temper-
ature". Any installed DHW circulation
pump is on.
Between 22:00 and 05:30 h, the DHW
cylinder temperature will not be rehea-
ted. Any installed DHW circulation
pump is off.
Your heating contractor can make fur-
ther settings for you during commis-
sioning.
You can change any settings individu-
ally at any time to suit your require-
ments (see chapter "DHW heating").
Frost protection
Your boiler, heating circuits and DHW
cylinder are protected against frost.
Wintertime/summertime changeover
This changeover is automatic.
Time and date
The day and time were set by your
heating contractor during commission-
ing.
Introductory information
Commissioning
5592 675 GB

Table of Contents

Other manuals for Viessmann GC1

Related product manuals