BA EZ26 en/us* 1.0 * EZ26_01_510.fm 5-43
Operation 5
Danger zone during lifting-gear applications
In lifting gear applications the load must be stabilized by slingers (B) with
the help of ropes (C).
Slingers must remain out of the danger zone – see chapter “ Danger zone
during lifting-gear applications” on page 5-43.
A
Fig. 183 (symbolic representation)
Danger zone with a bucket
Danger zone with a bucket and a safety distance of 1.5 m (59 in)
Danger zone with a grab (for example for picking up a pipe)
Danger zone with a grab and a safety distance of 1.5 m (59 in)
Safety distance of 1.5 m (59 in)
A
A
C
C
B
B