Auxiliary equipment
Anti-freeze filling system for water sprinkling
BA RD18 en 01
189
Fill the piping system
1
2
3
12
Switch off the diesel engine.
Water sprinkling system functional test: Switch the water sprinkling
system on when the machine is at a standstill (see page 93).
Take the hose [1] out of its holder.
Clean the end of the hose if it is dirty.
Insert the hose into the container [3] containing antifreeze solution.
Set the change over valve [2] to the anti-freeze filling system position.
Fill the piping system until the antifreeze solution exudes out of all the
spray nozzles.
Switch off the sprinkler.
Switch off the electrical system, and remove the ignition key.
Put the hose [1] back in its holder.
Set the switchover valve [2] to sprinkle.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RD18 and is the answer not in the manual?

Wacker Neuson RD18 Specifications

General IconGeneral
BrandWacker Neuson
ModelRD18
CategoryConstruction Equipment
LanguageEnglish

Related product manuals