30
B_04127
OPERATING MANUAL
VERSION 12/2015
ORDER NUMBER DOC2333558
Grounding cable
Procedure:
1. Ground the pump, connect the grounding cable to
potential equalization on-site.
2. Ground the product tank.
3. Ground the other parts of the system to an on-site
grounding connection. 16 mm;
Ex zone
All devices and equipment must be suitable for use in
potentially explosive areas.
Safe operation of the EvoMotion pump is only guaranteed with a ground
connection.
Connect all ground cables using a short and direct route.
Tank
All paints, ushing agents and waste tanks have to be electrically conductive.
All tanks must be grounded.