Installation manual
487 14 59 11 - TD30 TD50 TD75 US
38
Gas installation general
Test run
1. Loosen the measuring branch screw (2) 1/4 of a turn
and connect a manometer.
2. Select a programme that uses heat.
3. Start the dryer.
4. Check the nozzle pressure, see table on the following
pages.
5. If the gas pressure needs adjusting, adjust the setting
screw (4) under the cover screw (3) (higher pressure:
clockwise, lower pressure: anticlockwise)
Then move the manometer to branch (2) on the lower
valve and adjust the pressure as described above.
Move the manometer to branch (2) on the upper valve in
order to check the pressure - adjust if necessary.
6. Check that the gas is burning evenly and with a bluish
flame.
The numbers in brackets refer to the page regarding the
gas valve.
Function check
The function check is described in the back of this
manual.