EasyManua.ls Logo

Wega Concept - Checks and maintenance

Wega Concept
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Wegaconcept
Technical manual
ENGLISHOperation
Checks
Weekly
Monthly
Yearly
PERFORATED DISK and SEAL UNDER THE PAD
Every 4 months, replace
the shower (2) and
gasket under the pad
of the dispenser (4)
group (we
recommend
to use only
genuine parts)
proceeding
as follows:
loosen the screw ( 1);
remove the containment ring ( 3);
replace the perforated disk ( 2) and the seal under
the pad (4);
reassemble the components
X
Verify the correct
operation of the
pressure
limiting valve and
non-return drain valve
as follows:
PRESSURE RELIEF VALVE
block the pressure switch contacts;
wait for the boiler pressure to increase • and check
that the valve activates at the maximum pressure
of 2 bar.
NON-RETURN DRAIN VALVE
activate the delivery groups for about 30 sec-
onds;
attach a filter holder ( 5) with pressure gauge
(available on request) to the group;
activate the delivery group, and use the pressure
gauge (6) to monitor the pressure as it increases
up to 8-9 bar;
check the increase in the pressure due to the
expansion of the heated water up to a value of
approximately 12 bar: reaching this value con rms
proper operation of the valve, as well as of the
gaskets and solenoid valves seal;
check the other delivery groups.
X
1 2
3
4
6
5
Checks
Weekly
Monthly
Yearly
Verify the correct functioning of the PRESSURE
SWITCHES
Check for LIME SCALE on heating elements and
boilers.
Check the e ciency of the SOLENOID VALVES of
the delivery groups.
Check for any HYDRAULIC LEAKS and for the ef-
ciency of the drains.
X

Table of Contents

Related product manuals