EasyManua.ls Logo

Wega Concept - Setting the Number of Active Groups; 23.20 Loading the Default Data; 24 Water Meter; Viewing of the Litres of Water Used

Wega Concept
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
Wegaconcept
Technical manual
ENGLISHProgramming
23.19 Setting the number of active
groups
To set the number of active groups, proceed as
follows:
23.20 Loading the default data
To load the default data, proceed as follows:
insert the USB drive in the
programming reader (7);
turn on the machine by
pressing keys (1), (2), (3) on
the left keyboard.
ENTER
(x 5 secs.)
Hold down the ENTER button for at least 5 seconds.
Scroll the menu until the item is highlighted
13 NEW PROGRAM
14 DELIVERY TEST
15 GROUP WASHING
16 NUMBER OF GROUPS
ENTER Con rm to access the menu
GROUPS NUMBER
X
ENTER Con rm to exit the menu.
13 NEW PROGRAM
14 DELIVERY TEST
15 GROUP WASHING
16 NUMBER OF GROUPS

To exit the programming menu
24 Water meter
24.1 Viewing of the litres of water used
To view the litres of water used, proceed as follows:
insert the USB drive in the
programming reader (7);
hold down the ( ) button
for at least 5 seconds.
the litres of water used (on
the left) and the quality of
the water set for the next
regeneration (on the right)
will be displayed.
REGENER. SOFTENER
000100 001500
REGENER. SOFTENER
000000 001500
Amount of water used Amount of water set in
litres
24.2 Resetting the litres of water used
proceed as indicated in the previous paragraph
hold down the ( ) key for 10 seconds, until the litres
of water used is reset.
321
7
7

Table of Contents

Related product manuals