EasyManua.ls Logo

Westerbeke 3.5 SBCG - Installation; Rigging and Lifting; Location and Mounting

Westerbeke 3.5 SBCG
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
RIGGING
AND
LIFTING
The engine/generator
is
fitted
with
lifting
eyes.
Attach
wire rope or chain
slings
capable of supporting
the
engine/generators weight to the
eyes
and
lift
the
engine/gen-
erator
by
means
of tackle attached
to
these
slings.
The
lifting
eyes
have
been designed
to
carry
the
full
weight:
auxiliary
slings
are
not
necessary.
NOTE:
Rigging work
is
best
done
by
someone
experienced
and competent
in
handling
machinery.
LOCATION
AND
MOUNTING
A solid, level mounting platform
is
very
important
for
the
proper operation of
your
generator. Select a location that will
allow adequate space
on
all sides for ventilation
and
servic-
ing.
Locate the generator away
from
living quarters,
and
away
from
bilge splash and
vapors.
Refer
to
WESTERBEKE'S
installation
manual
for
detailed
information
on
installing
a
Marine
Generator
in
a
boat.
USE
THE
PAN
AS
A
TEMPLATE
FOR
LOCATING
THE
PROPER
MOUNTING
HOLES
TO
THE
PLYWOOD
BASE
3/4"
PLYWOOD-BOLTED/FIBERGLASSED
IN
PLACE
BATTERY
ATTACHMENTS
.
TO
STARTER
MOTOR
REFER
TO
THE
WIRING
DIAGRAM
IN
THIS
MANUAL
{-)NEGATIVE
LEAD
·
(+)
POSITIVE
NOTE:
Ensure
that
the
B+
battery
cable
connected
to
the
LEAD
remote
mowued starter solenoid
is
properly supported
to
prevent unwanted stress
on
the
solenoid.
5
"':
SIDE
VIEW
RAW
WATER
INLET0.5in
(2.7mm)
J.D.
HOSE
TDPVIEW.
WATER
OUTLET
AND
DISCHARGE
HOSES
0.51n
(2.7mm)
I.D.
·FOUR
1/2"
BOlTS
DIMENSION
(INCHES
AND
MM)
DIMENSIONAL
DRAWINGS
For dimensional drawings.
View
the
drawings
on
the
Westerbeke
website www.westerbeke.com
for
the
most
cun-ent
drawings with
dimensions.

Related product manuals