8.20 Prepare the engine for a long shutdown period
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate 1
Support equipment
Description Part No. CSN QTY
None
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped. Refer to section 8.18 Prepare the engine after stop -
general
X35-B
AA00-0000-00AAA-151B-A
Operation Manual Prepare the engine for a long shutdown period
Winterthur Gas & Diesel Ltd.
- 336 - Issue 001 2019-10