10.14 Temporary isolate the HP SCR system
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 4.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate 1
Support equipment
Description Part No. CSN QTY
Cover 94820 2
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
PRELIMINARY OPERATIONS
• The engine must be stopped and prepared for maintenance, refer to section 8.18 Prepare
the engine after stop - general
X35-B
AA00-9270-00AAA-720C-A
Operation Manual Temporary isolate the HP SCR system
Winterthur Gas & Diesel Ltd.
- 420 - Issue 001 2019-10