Installation
Greenstar Heatslave II
ErP -
6 720 813 344 (2014/09) 21
5Installation
5.1 Unpacking the boiler
Unpacking
It is advised that two or more persons are involved in the transfer of the
packaged boiler from the van to the point of delivery.
1. Once the packaged boiler has been delivered, the outer carton is
removed first. Care should be taken when releasing the straps. If a
sharp implement is used make sure the outer carton is not pierced
and that the implement is used in such a way so that it may not cause
personal injury. All sharp objects must be covered or the blade
retracted after use and put away in a safe place.
2. Lift carton up and away from the boiler.
▶ Remove the plastic bag and upper front protection cover from the
boiler and place safely aside.
3. Pull control box drawer forward and remove the 2 screws [A] from
the front panel.
4. Lift front panel [B] upwards slightly to disengage and remove. Store
safely away from the working area.
5. Remove the bolts securing the boiler to the transport pallet.
▶ Two or more persons are required to remove the boiler from the
pallet taking care not to damage the boiler, panels or the floor.
Fig. 25
Lifting and carrying precautions:
▶ Lift only a manageable weight, or ask for help.
▶ When lifting or putting things down, bend the knees,
and keep the back straight and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry objects close to the body.
▶ Wear protective clothing and gloves to protect from
any sharp edges.
At all times the correct method for handling heavy
objects should be strictly observed.