Sensor Wire number Base unit terminal
FLS - Leakage, stator housing 1 13
2 14
Pt100 - Temperature measurement, main bearing 3 8
4 4
Thermal switches - Temperature guard, stator windings 5 1
6 2
FLS - Leakage, junction box 7 15
(2) (14)
Pt100 - Temperature measurement, stator winding phase 1 8 3
(4) (4)
Pt100 - Temperature measurement, stator winding phase 2 13 5
14 7
Pt100 - Temperature measurement, stator winding phase 3 15 6
16 7
Pt100 - Temperature measurement, support bearing 17 9
18 10
CLS - Leakage, oil housing 19 17
20 16
VIS 10 - Vibration sensor 21 18
22 19
2. Connect the pump memory.
Function Wire number Base unit terminal
RS-485 B 9 38
RS-485 A 10 37
Supply, ground (earth) 11 36
Supply, +12 V 12 35
3. When applicable, connect the cable screen to the ground (earth) terminals in the
pump and in the electrical cabinet.
5.2.3 Connect a 12-wire cable from a midrange pump
1. Connect the sensor wires.
Sensor Wire number Base unit terminal
FLS — Leakage, stator housing 1 17
2 16
Pt100 — Temperature measurement, main bearing 3 8
4 4
Thermal switches — Temperature guard, stator windings 5 1
6 2
Pt100 — Temperature measurement, stator winding phase 1 8 3
(4) (4)
2. Connect one of the following sensors:
5 Electrical Installation
MAS 711 Installation, Operation, and Maintenance Manual 13