Maintenance and inspection
9 - 48
9 Wiring harness in the robot
(wires of the S-, L-, U-, R-, B-
and T-axis)
Visual, multimeter Check for conduction between the main con-
necter of base and intermediate connector with
manually shaking the wire. Check the protection
spring
2
.
Replacement
3
10 Wiring harness in the robot
(wires of the B- and T-axis)
Visual, multimeter Check the wires between the terminals for wear.
Replacement
11 Protective tube Visual inspection Inspect the protective tube for holes, cracks and
adhesion of welding spatters (replace if neces-
sary).
Refer to manual "OPTIONS FOR PROTECTIVE
TUBING (VELCRO TYPE) REPLACING PRO-
CEURES".
12 Battery pack in robot If a battery alarm appears or after the robot has
been operated for 36,000 hours, the battery
must be replaced.
Inspection intervals
Item number
1
Schedule Checking method Operation Inspection
Charge:
Daily
Every 1000 hours
Every 6000 hours
Every 12000 hours
Every 24000 hours
Every 36000 hours
trained staff
YASKAWA trained staff
YASKAWA staff