EasyManua.ls Logo

Zoeller MEDIUM X2 - End of the Workday; Loading

Zoeller MEDIUM X2
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating instruction 28
o The position of the pushing wall must be checked before starting any collective round
(empty body). The pushing wall should be located approx. 0.5 m from the back of the
body. If necessary, move the pushing wall.
FOR YOUR INFORMATION
Starting the body is necessary to use body functions.
6.3.2 End of the workday
After finishing put RCV on parking position:
o Switch off the vehicle engine and remove the ignition key
o Secure the vehicle against involuntary rolling by applying the parking brake
o Press: slider on the top, scraper opened
o Set the pushing wall at the back of the body
o Close and secure tailgates
o Put the lifter in the parking position
The RCV is in parked position
6.4 LOADING
The loading process consists of 4 stages and in automatic mode takes about 14-16
seconds.
Step 1
Scraper opens.
Step 2
Slider goes down.

Table of Contents