EasyManua.ls Logo

3Com 3C509B - Running the Group 3 Test; Starting the Group 2 Test; Assembling a Loopback Plug

3Com 3C509B
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
104 CHAPTER 7: TROUBLESHOOTING FOR WINDOWS 3.X
Figure 60 Assembling a Loopback Plug
Starting the Group 2 Test
Follow these steps to run the Group 2 test on either the
3C509B-TPC or 3C509B-COMBO NIC:
1 Connect the loopback plug to the round BNC
connector on the NIC.
2 Start the Configuration and Diagnostics Program,
as described in “Starting the DOS Configuration and
Diagnostics Program” on page 102.
3 From the Test menu, select Test Setup.
4 Enable the Group 2 test. Select OK and press Enter.
5 Go to the Run Tests dialog box to start the tests.
6 After the test is completed:
a Exit the Configuration and Diagnostics Program.
b Remove the loopback plug.
Running the Group 3 Test
The Group 3 test is the Echo Exchange Test. It tests to see if
the NIC can transmit and receive data while connected to
the network. If you have successfully run the Group 1 and
Group 2 tests, a failure in the Group 3 test usually indicates
a cabling, hub, or network problem.
CAUTION: Do not use an active network to run the
Group 3 test.
50
Terminator
50
Terminator
T connector
Book Page 104 Monday, June 7, 1999 8:55 AM

Table of Contents

Related product manuals