Hardware Installation
After this installation phase, all cabinets are positioned, fastened, leveled, and
anchored to the site floor.
4.2.1 Unpacking
When unpacking the cabinet, perform the following steps:
1. Open the cabinet case using the Vikex opener.
2. Lift the cabinet using a cabinet hoist or at least four people.
3. Place the cabinet on the floor in an upright position. Take extra care to
avoid the cabinet from tipping over, as it is not yet secured to the floor.
4. Remove the plastic wrapping from the cabinet.
5. Move the cabinet to its position according to the floor marking, using a
cabinet lifter or at least four people.
4.2.2 Cabinet Layout
Make sure all preparations for placement of cabinets at the site, including floor
marking, were done during the site planning stage, see the environmental
spec for MX-ONE SITE PLANNING.
For examples of cabinet layouts at the MX-ONE site, see the environmental
spec for MX-ONE SITE PLANNING.
4.2.3 Mounting Sets
This sections lists all the mounting sets used when mounting and grounding the
BYB 501 cabinets. Refer to the relevant mounting set table in each installation
step.
In the tables screws are named for example M 4X8, M 4 = metric thread 4
millimeters, and 8 = 8 millimeters in length.
Table 6 Cabinet Frame (normally mounted)
1/BYB 501 180 Cabinet Frame
Pos. Title/Function Product Number Quantity
RACK FRAME, H=1800, METRIC, W=450 SXK 118 0444/1
1
MOUNTING BAR, H=1800, METRIC SXA 210 026/1
2
SCREW M 4X8 24/SBF 228 040/0080
24
A,
B
FOOT WITH ADJUSTING NUTS SXK 118 0159/1
4
DESIGNATION LABEL SVH 290 51/2
2
276/1531-ASP 113 01 Uen J2 2008-07-17