45 Installation
EN
6.1.2 Prepare the foundation - Terra 60
6.1.2.1 Prepare the prefabricated foundation - Terra 60
A
B
D
C
C
Z1
Take the prefabricated foundation (A).
NOTE
Contact the manufacturer to order the
foundation for your EVSE.
NOTE
Refer to “11.3. Prefabricated foundation -
Terra 60 for the foundation specifications.
Dig the pit (B) for the foundation (A).
Place the foundation in the ground pit.
The front side is indicated by an arrow.
A
B
D
C
C
Z1
Leave the foundation 15 mm above the ground level (D).
Prepare the site and the conduits (C); route the power
and signal cables inside the foundation thought the
conduits applying cable slack of each cable 1000 mm.
Pour concrete around the foundation to lock in place
the conduits and the foundation itself.
6.1.2.2 Prepare a cast foundation - Terra 60
Make the cast foundation according to the specifications
NOTE
Refer to “11.1. Footprint - Terra 60 for the
foundation specifications.
Prepare the site and the conduits
Route the power and signal cables highlighted in blue
thought the conduits applying each cable slack of 1000
mm.
Create fixation holes for the EVSE base (in yellow).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB 2 Series and is the answer not in the manual?

ABB 2 Series Specifications

General IconGeneral
BrandABB
Model2 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals