EasyManua.ls Logo

ABB 2 Series - Page 80

ABB 2 Series
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 “Operation and installation manual - “Terra 360 Series 2 - CE”
EN
11.2 Footprint - Terra 360
The drawing (top view) shows all the necessary measurements to:
drill the holes to fasten the EVSE to the floor/basement (in yellow)
prepare the position of the cables in the ground (in blue)
FRONT SIDE
663
612,9
88 88
506
215 215
124,5
47,27
292,77
237 134
56 52 52
52 82
45,03
371,97
38
58,03

Table of Contents

Related product manuals