EasyManua.ls Logo

ABB ACH480 Series - 8 Installation Checklist of the Drive; Contents of this Chapter; Checklist

ABB ACH480 Series
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Installation checklist of the
drive
Contents of this chapter
This chapter contains a checklist of the mechanical and electrical installation of the
drive.
Checklist
Examine the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death, or
damage to the equipment can occur.
If you are not a qualified electrical professional, do not do installation or
maintenance work.
WARNING!
Stop the drive and do the steps in section Electrical safety precautions (page 17)
before you start the work.
Make sure that
The ambient operating conditions meet the drive ambient conditions specification, and
enclosure rating (IP code or UL enclosure type).
Installation checklist of the drive 111

Table of Contents

Related product manuals