EasyManua.ls Logo

ABB ACS800-37-0170-3 - Joining the Shipping Splits; Procedure

ABB ACS800-37-0170-3
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation
52
Joining the shipping splits
The busbar systems and wiring harnesses of two shipping splits are joined in the
common motor terminal cubicle (if present) or a busbar joining cubicle. Special M6
screws for fastening the shipping splits together are enclosed in a plastic bag inside
the rightmost cubicle of the first shipping split. The threaded bushings are already
mounted on the post.
Procedure
Fasten the front post of the joining section with 7 screws to the front frame post of
the next cubicle.
Threaded bushing
Maximum tightening torque:
5 Nm (3 ft.-lbs)
7
7

Table of Contents

Related product manuals