EasyManua.ls Logo

ABB Aztec 600 - Replacing Analyzer Tubing

ABB Aztec 600
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Aztec 600 ISE ammonia and fluoride
Single-stream ion-selective analyzers 13 Maintenance
OI/AXM630–EN Rev. I 67
13.3.2 Replacing Analyzer Tubing
Referring to Fig. 13.3:
1. Remove low calibration solution tubing A from valve
connector and discard.
Fit 1.5 m (5 ft),
3
/32 in. ID Tygon tube part no. 0212362.
2. Remove high calibration solution tubing B from valve
connector and discard.
Fit 1.5 m (5 ft),
3
/32 in. ID Tygon tube part no. 0212362.
3. Remove in-line mini barbed nipple connector C,
complete with reagent inlet tubing D and discard.
Connect one end of new in-line mini barbed nipple
connector part no. 0214060 to reagent tubing – see H in
Fig. 13.2.
Fit 1.5 m (5 ft) size 13 Tygon tube part no. 26-0027-A to
other end of mini connector.
4. Remove flowcell drain tube E from flowcell drain / outlet
connector and discard.
Fit 1 m (39 in) tube part no. 0212176.
5. Remove sample inlet tubing F from valve connector and
side sample pot lower connector and discard.
Fit 420 mm (16.5 in) of
3
/32 in. ID Tygon tube cut from
remaining length of tube part no. 0212362.
6. Remove valve manifold interconnect tubing G from valve
connectors and discard.
Fit 120 mm (4.7 in) of
3
/32 in. ID Tygon tube cut from
remaining length of tube part no. 0212362.
7. Remove heated block assembly inlet tube
J and
discard.
Fit remaining 140 mm (5.5 in) of
3
/32 in. ID Tygon tube part
no. 0212362.
8. Remove mixer assembly inlet tube
J and discard.
Fit 75 mm (3 in) of
3
/32 in. ID Tygon tube cut from remaining
length of tube part no. 0212362.
9. Remove heated block assembly inlet tube K and
discard.
Fit 30 mm (1.2 in) of
3
/32 in. ID Tygon tube cut from
remaining length of tube part no. 0212362.
Fig. 13.2 Replacing the Pump Tubing and Capstans
G
H
D
C
F
E
J
K
L
M
Note. Mixer fitted to
fluoride analyzers –
optional fitting on
ammonia analyzers.
Note. Take note of the routing of all tubes removed in the
following procedures to ensure the replacement tubing is
routed correctly.
Note. Step 7 is applicable only to ammonia analyzers.
Note. Steps 8 and 9 are applicable only to fluoride
analyzers (ammonia optional).

Table of Contents

Other manuals for ABB Aztec 600

Related product manuals