Perform the following steps to unpack the UPS equipment from the standard packaging:
1) and 2) Using a forklift load the unit by paying attention to the COG (see the warning above) and
bring the unit(s) close to the end position.
3) Remove the plastic film from the UPS, by cutting it on one edge (where there is the cardboard
underneath). Remove the 4x cardboard edges carefully by paying attention that the accessory box
placed on top of the UPS does not fall down. Lower the accessory box with the help of a stool or
ladder; make sure you remain safe.
4) After having placed the UPS in its final position, disassemble the left and right dedicated
transportation socket.
5) You may want to keep all packaging materials for later use.
1) 2)
3)
2)
Figure 4: Photographs of Conceptpower DPA with standard packaging