Modifications reserved
3. DUAL INPUT FEED - Connect the input wires 3-phases + N coming from the LV
Distribution Board (mains), by referring to the table here below. Keep the phase rotation in
clock-wise sense. In case of dual input with 2xN wires, the 2xN have to be at the same
potential, ideally they have to be joined together somewhere upstream the UPS. Dual input
feed with just 1xN is also possible.
4. Connect the output wires 3-ph + N. N at the output is not mandatory (depends on the type
of load).