2. SEPARATE BATTERY - Connect the PE wire(s) and then connect the battery wires for
each module by making sure the polarity (+) and (-) is respected! It’s is not important which
module you start wiring first. Important is to keep clearance for the
Filter PCB
(shown in the
figures below). Accessing to the filter PCB after the UPS installation is important for the
service technicians to measure the voltages safely.
Battery PE connection - bottom cable entry
Battery PE connection - top cable entry
Separate battery, bottom cable entry
Separate battery, Top cable entry