EasyManua.ls Logo

ABB DressPack - Page 79

ABB DressPack
258 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
2
CAUTION
The cable package is sensitive to mechanical
damage. Handle it with care in order to avoid
damaging the cabling or the connectors.
3
Tip
This procedure is best done by two persons
working together - one pushing cabling and hoses
into the tube and the other pulling them out at the
wrist.
4
xx1400000095
Carefully push the cable package into the insert,
through the tube and out in the back of the arm
housing.
Tip
The following order is preferable:
1 Cables
2 Hoses
3 Weld cables (where applicable)
If there is a problem, remove the nut inside the
tube.
5
Apply cable grease
It is necessary to apply cable grease on the cable package inside the tube.
NoteAction
Carefully pull the cable package out 10 to 15
centimeters longer than the final assembly positi-
tion.
1
xx1400001389
Apply grease on the highlighted area.2
Continues on next page
Product manual - DressPack/SpotPack IRB 8700 79
3HAC055802-001 Revision: B
© Copyright 2015-2017 ABB. All rights reserved.
2 Installation
2.4.3.2 Fitting the cable package IRBDP MH3 UI
Continued

Table of Contents