EasyManua.ls Logo

ABB SF6 LTB 245E1 BLG 1002A - Page 121

ABB SF6 LTB 245E1 BLG 1002A
231 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Mechanism Maintenance
1HSB515409-100 en rev2 21
1. Connect a time-meter across the signal contacts 20, 29, 291 and 292 in
accordance with the circuit diagram.
2. Measure the times t
1
, t
2
and t
3
3. Turn the switch “Local/Remote” to the “LOCAL” position.
4. Connect the time-meter across terminals X1:190 and X1:192.
5. Turn the switch “On/Off” to the “OFF” position and then the “ON” position.
6. Note down the times t
1
, t
2
and t
3.
7. Disconnect the time-meter.
8. Turn the switch “Local/Remote” to the “REMOTE” position.
Figure 4-1. Time measurement, contact travel.
Contact travel
Arcing contact
Closed
Auxiliary contact
Open
t
2
t
3
t
1
Time
t
1
ms Proportional to the contact’s opening speed.
t
2
ms Time that determines contact damping.
t
3
ms Proportional to the contact’s closing speed.
B20018
Contact travel

Table of Contents

Related product manuals