MOUNTING AND WIRING 4-35
SB1391 Hardware and Setup Guide - Document revision no. 1.14
TABLE 4-25 Current test points
Test point Use
A_OUT
Analog output with respect to GND. ±10V.
GND Ground for analog input.
IS Phase S current sensing. The scale factor is 8V per Ipeak.
IT Phase T current sensing.
The scale factor is 8V per Ipeak.
Example: For the SB1391A (10A peak current), scale factor is 0.8V/A.