INSTALLATION & MAINTENANCE MANUAL • X-MIND DC • (06) • 10/2018 • NXDCEN020F
Pag. 37 of 51
INSTALLATION CHECK LIST
8.1. INSTALLATION CHECKS
PLEASE NOTE
After the completion of the installation of the X-MIND DC, the installer technician MUST fill in the form contained in this
document to certify that the device has been correctly installed.
The Installation Checklist Form must be completely filled in all the details, stamped and signed by the installer technician and
must be sent by e-mail to de Götzen S.r.l.: imaging.italysupport@acteongroup.com
de Götzen S.r.l. reserves the right to reject the filled Installation checklist Form if not correct or complete in each part or with
any test not passed: in these cases, or if the form has not been sent to de Götzen, any kind of right of the user will be
automatically off, including any kind of responsibility of the manufacturer.
Any future claims and/or complaint will be considered null and void.
Make 3 copies of the filled in form:
o One for de Götzen (soft copy)
o One for the User (keep it with the device documentation)
o One for the Dealer (installer technician)
PLEASE NOTE
If you encounter problems that don’t allow to correctly pass the tests or you have any doubt for the correct installation of the
equipment, contact immediately your referring technician or the manufacturer:
imaging.italysupport@acteongroup.com
Since the authorized installer technician is in charge to perform the installation and tests of the X-MIND DC, he/ she has the full
responsibility of the correct installation of the equipment