EasyManua.ls Logo

Advanced Poly-Packaging T-1000 - 6.1 Preventative Maintenance Overview; 6.2 Preventative Maintenance Checklist

Advanced Poly-Packaging T-1000
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.1 Preventative Maintenance & Scheduled Maintenance
To extend the life of the T-1000, qualified maintenance personnel must perform all required
maintenance tasks. Failure to perform scheduled and preventative maintenance may cause
excessive wear to components and will void the warranty. For the purpose of this manual,
preventative maintenance (PM) tasks are considered periodic tasks which should be performed
on a daily, weekly or monthly basis.
Scheduled maintenance tasks are performed when the T-1000 Maintenance Chart Number
changes to a higher number. Scheduled maintenance tasks (CHART items) are performed
dependent upon the number of machine cycles and therefore are not considered "periodic" tasks.
Legend for Preventative Maintenance Checklist
MonthlyM
WeeklyW
DailyD
6.2 Preventative Maintenance Checklist
ITEM DESCRIPTION PERIOD
MTighten boltsHeight adjustments screws
MTighten set screwsTouch Screen cabinet / arms
MInspect for looseness, tighten as requiredDrive belt (right panel)
MInspect for wear / fraying, replace if neededDrive belts
MClean and wipe down with lightweight oil (based upon
environmental - humidity conditions)
Side-plates
MRemove all covers, clean and blow out compartments with compressed air to
remove dust and dirt
Compartments / Covers
MInspect for loose air lines, listen for leaks, tighten or replace poly tubing as
needed
Air lines / Valves / Cylinders
MInspect for loose wiring / connectors, tighten as neededWiring / Connectors
MInspect for contamination of filter, replace as needed
Inspect for blockage / air restriction
Micron filter / Venturi
WClean with alcoholLower (alum.) roller
WInspect for nicks or cuts, clean with alcoholUpper (rubber) roller
WClean sensor assembly with alcoholPerforation sensor
DClean with alcoholPressure bar (rubber)
DCheck operation, adjust as needed (Chapter 4.10)Anti-jam device
DAdjust pressure to 80 PSIAir regulator
DDrain water from filterFilter / Air regulator
CAUTION: Unplug power cord and disconnect air line prior to removing guards, funnels or
covers. Preventative Maintenance must be performed by qualified maintenance personnel.
128

Table of Contents

Other manuals for Advanced Poly-Packaging T-1000