Introduction
7-4
Agilent Technologies Representative Checklist
Prior to Installation
(Established Hospital Building)
___ Conference with Superintendent.
___ Establish site locations in building.
___ Establish number of bedside units and review the definitions
of Care Units, bed labels, tuning ranges.
___ Establish type of patient monitors at bedside and remote
areas.
___ Establish type of Information Center customization (alarms,
scales, and recording parameters, for example).
___ Plant engineer (or electrician)/architect aware of the number
of conduit runs.
___ Plant engineer/architect aware that he should call for
recommended conduit for all cable runs, that installation is
the responsibility of the hospital. Refer to table Table 8-1 on
page 8-10.
___ Plant engineer aware that hospital is responsible for
supplying and installing wall boxes—NEMA conduit switch
wall boxes with a minimum depth of 7cm (2 3/4 in.) with
conduit knockouts (such as RACO 560 or 562).
___ Outline dimensions and specifications given to plant
engineer/architect of recommended NEMA bedside switch
wall boxes (such as RACO 560 or 562).
___ Plant engineer/electrician aware that cable pulling is the
responsibility of the hospital and “pull boxes” are required
(local electrical code) at recommended intervals based on
number of conduit bends and cable length.
___ Plant engineer/electrician/architect aware that no other
wires should be run in the same conduit with signal cables.
___ Plant engineer aware that installation of Agilent Technologies
supplied wall mounts is the responsibility of the hospital.
___ Plant engineer/electrician/architect aware that AC power
diathermy cables, and so on should be run far enough away
from site to prevent interferenceat least 0.3 m (1 ft.) away.
___ Plant engineer given dimension of the SDN Agilent CareNet
Controller (ACC).
___ Plant engineer aware that plywood panel must be mounted at
the ACC site location 40.6 cm high x 50.8 cm wide x 1.9 cm
deep (16 in. H x 20 in. W x 3/4 in. D) minimum, if unit is wall
mounted. If rack mounting, aware that 19"
telecommunications rack must be mounted.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 78581B and is the answer not in the manual?

Agilent Technologies 78581B Specifications

General IconGeneral
BrandAgilent Technologies
Model78581B
CategoryController
LanguageEnglish

Related product manuals