Site Preparation/Installation Checklists
7-5
___ Plant engineer aware that LAN cable must be Cat. 5,
installed, and certified.
___ Plant engineer/electrician aware of the number and location
of AC power 3-wire (one ground wire) outlets.
Note
Each IC requires two AC outlets and each recorder or hard copier requires
one AC outlet.
___ Point-to-point cable length measurements according to bed
numbers have been received. Order at least 10% overrun to
prevent getting a cable too short to do the job.
NO SPLICING—CONTINUOUS CABLE RUNS ONLY.
___ Confirmed move-in date with administrator and electrician.
___ Confirmed move-in date with head nurse so that patients in
wing will be assured minimum discomfort while the
installation is being made.
___ The “clerk of the works” has a move-in day assigned for the
equipment.
Note
Go over the check list and correspondence again; it will be worth the effort!
Oversights will cause delays; delays often run cost up exponentially.