Architect Checklist
Prior to Installation
___ Builder knows the number, size, and location of conduit runs.
___ Builder knows the number, location, and voltage of AC power
outlets.
___ Builder knows location and number of each type of system
outlet box.
___ Builder/electrician aware that he must install switch wall
boxes (and conduit when necessary).
___ Builder and electrician aware that only patient monitor
signal cables can be run in conduit and that AC power,
diathermy cables, and so on, should be run far enough away
to prevent interference—at least 0.3 m (1 ft.) away.
___ Builder aware that Agilent Technologies requires NEMA
conduit switch wall boxes at each bedside station, remote
station, and possibly at the Patient Information Center.
___ Builder aware that Agilent Technologies will supply
faceplates for standard NEMA switch wall boxes.
___ Builder aware that Agilent Technologies will supply SDN
Agilent CareNet Controller (ACC).
___ Builder aware that Agilent Technologies may supply SDN or
LAN cables.
___ Builder aware of mounting requirements of brackets and
shelves if these are to be used.