Site Preparation/Installation Checklists
7-7
Hospital Representative Checklist
Prior to Installation
Building
___ Route from receiving dock to system site can accommodate
equipment (ceilings, stairways, corridors, elevators, and so
on).
Area Layout
___ Floor plan has been established and permits access to
equipment for service and operation.
___ Storage area is available for manuals, accessories, and
consumables. Contact your local Agilent representative for
space requirements.
Environment
___ Floor can support equipment.
___ Ventilation or air conditioning maintains ambient
temperature between 5° C and 30° C (41° F and 86° F) at
less than 80% relative humidity.
Electrical Power
___ Power distribution type has been established and proper
receptacles provided. Proper hospital grade connector has
been selected and Agilent representative notified of selection.
___ Grounding precautions have been taken.
___ A separate circuit, capable of handling present and future
loads, has been installed.
Miscellaneous
___ Review definition of Care Units, bed labels, and tuning
ranges with hospital personnel.
___ Variable length cables have been measured and specified
with related labels.
___ Conduit and outlet box installation has been planned and
completed.
___ Sufficient consumables have been ordered.
___ Bedside station, remote area, and Patient Information Center
instrument mounts have been planned/installed.
___ Plywood panel has been installed at the ACC site location, if
mounting unit on the wall or access to 19”
telecommunications rack if rack mounting unit.
___ Operator training for medical personnel has been scheduled.