EasyManua.ls Logo

Agilent Technologies G1289

Agilent Technologies G1289
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintaining the Instrument
Installing the Transfer Line onto the Volatiles Interface
96
Installing the Transfer Line onto the Volatiles Interface
If you are using your headspace sampler with a 6890 and a volatiles interface,
install the transfer line onto the interface as follows:
1. Install an appropriate-sized male nut and steel ferrule onto the transfer
line.
2. Connect the transfer line to the interface. Tighten the nut 1/4-turn past
finger tight. Do not overtighten. If the nut leaks, tighten an additional
1/8-turn.
3. Check for leaks. See your 7694 Headspace Sampler Site Prep and
Installation Guide for details.
Transfer line
Nut
Volatiles
interface

Table of Contents

Related product manuals