MC250 page 47 of 78
MC250 Rev.02-USA (+34) 944 71 16 00 (+34) 944 53 17 54 export@alba.es www.alba.es
5. MAINTENANCE OF THE MACHINE
5.1. Daily maintenance
Dailymaintenanceincludesbasicoperationsofvisualinspectioninthehoist,performedbythe
personRESPONSIBLEofthehoistonthebuilding.EVERYDAY,priortouse,visualinspectionof
theelevatorshouldbedone:
Alltheprotectionsareinstalled,andtherearenodangerousholesorgaps.
There´snoaccumulationofice,snoworrubbishinsidethecage,ornearthehoist.
There´snoexcesivewearintherack,orintheverticalpipeofthemast.
Loadinformationplateisinstalledonthecarrier.
Zonebelowthehoistisdelimitedandprotected.
Thereisn´tanywarpedorcrackedpart(Caseof,changeit).
Electricalwiresarecorrectlyinstalledandtightlyguidedonthehoist.
Guiderollersaretouchingthemasttubeandwithoutexcesivewear.
Therearenopowerlinesnearthehoistthatendangerpeopleormachine.
Therearenooutgoingelementsinthefacadethatmayinterferewiththemachine.
Electricalsafetydevicesareoperational(doors,endtrackswitch,mastsensor.
Emergencystopworksproperly.
Anchoragesarecorrectlyinstalled.
Rack‐piniontransmissioniscorrectlyengaged.
Controlandpowerboardsareingoodcondition.
Allthecontrols,panelsandindicatorsworkproperly.
Cabletravelsandslidesoverthecableholderproperly.
Onceallthelistedcheckpointsarereviewedandtheproblemsthathaveappearedhavebeen
solved,themachinecanbesafelyused.
WARNING
Before carrying out any maintenance intervention under the machine, disconnect
the power supply and block the movement of the cabin on the rack, creating a
minimumclearanceof1.8munderthelift.
MaintenancetasksmustbeperformedWITHOUTLOADS.