MC250 page 48 of 78
MC250 Rev.02-USA (+34) 944 71 16 00 (+34) 944 53 17 54 export@alba.es www.alba.es
5.2. PERIODIC maintenance schedule
Maintenance of the lift must be performed by the staff responsible for the machine and the
resultshavetoberecordedontheMAINTENANCERECORD.
MAINTENANCECHECKLIST OPERATION FREQUENCY
Visualchecks
Upper/lowerstopcams Checkstatus
40hwork
ormonthly
Mastdetector Checkdistance±5mm(0.19in)
Gearmotoroillevel Checklevel
Pushbuttonandwarninglights Checkoperation
Masttube Wear,erosionorwelding
Motorbrakerectifier Checkoutputvoltage
Communicationcable Checkstatus
Guiderollers Visualcheck
Anchorage Checkinterference
Basebuffers Checkstatus
Grease
Mastrack
Uselyticfat
40hwork
ormonthly
Gearmotorpinion
Parachutepinion
Tighten
Mastconnectingbolts
Usefixedkeys
Quarterly
(4times/
year)
Screwforallstructureanchors
Measurements
Guiderollersdimension Measurewithcaliber
Annual or
after
disassembly
Rackdimension Measurewithcaliber
Gearmotorpinionstring Measurewithamicrometer
Motorbrakeairgapchecking Measurewithgauges
General
inspection
Masts Deformationordamage
After
disassembly
or after
periods of
non‐use
Anchorages Deformationordamage
Doors,handrails,floors Deformationordamage
Gearmotorandbrake Checkrectifier,voltageandcoil
WARNING:
Incaseofelectricalmalfunctioninthehoist,donothandleelectrical
equipment. Maintenance and inspection of the hoist only must be
performedbyauthorizedpersonnel.