16. Pull off the bearing cover
.
17. When the hopper is closed off with the sliding
shutter,
pull the metering roller
out of the metering
unit.
18. Install the new metering roller.
CMS-I-00002500
19. Align the catch
on the bearing cover
with
the drive shaft.
20. Install the bearing cover.
21. Tighten the bolts with the wrench
.
22. Park the wrench in the holder
.
CMS-I-00002504
23. Park the sliding shutter
on the metering
housing.
24. Swivel the bolts
in front of the sliding shutter.
25. Tighten the bolts with the wrench
.
CMS-I-00002503
6 | Preparing the machine
Preparing the implement for operation
MG6492-EN-II | P.1 | 21.11.2023 | © AMAZONE
66