26. Empty the calibration bucket.
27. Put the calibration bucket in the storage
compartment.
28. Close the calibration flap
.
29. Lock the locking lever
on the metering
housing.
CMS-I-00003654
30. To activate both conveyor sections
,
put the lever
back in the centre position.
CMS-I-00002543
6.3.7.5 Calibrating the metering unit
REQUIREMENTS
The hopper is at least 1/4 filled with spreading
material
1. If the implement is equipped with a double
sluice,
activate the conveyor section
with the lever
.
CMS-I-00002542
CMS-T-00003323-E.1
6 | Preparing the machine
Preparing the implement for operation
MG6492-EN-II | P.1 | 21.11.2023 | © AMAZONE
67