13 - 1
Lancom 4Portable Flue Gas Analyser
User Guide
13 Shipping Instructions
WARNING
Before shipping the instrument by air, you must abide by the IATA
Special Provision A67 by following the instructions below.
1) Unscrew the side panel screws and remove both instrument side panels.
2) Disconnect the positive (red) lead from the each of the batteries.
3) Insulate each exposed battery terminal with an insulating sheath
(supplied originally with the instrument). Alternatively, use a suitable
material to insulate each terminal.
4) Rettheinstrumentsidepanels.
5) On the shipping waybill, you must include the words “Not Restricted,
as per Special Provision A67” in the description.