Pre-Installation Requirements
Personnel Technical Level Required for Installation
The operations in this section should be performed only by qualied
service personnel experienced in electrical safety techniques. Never
service the analyzer unless power has been removed from the analyz-
er, and the analyzer has been allowed to cool for at least 90 minutes.
Always use gloves when working on the analyzer.
Storage Prior to Installation
If the analyzer is stored for any period of time prior to installation, store the
equipment in an environment where it is not subject to dripping or splashing
liquids, corrosive gases, high humidity, or excessive heat or cold. Recommend-
ed storage conditions include:
Temperature: 0 °C to 50 °C (32 °F to 122 °F)
Relative Humidity: <90 %, non-condensing
Failure to comply with these storage conditions will void your warranty.
Analyzer Site Preparation
Observe the following guidelines when selecting an analyzer installation loca-
tion:
• Space Requirements
Nema-4x enclosure – approximately 64 x 35 x 67 cm plus clearance for
analyzer connections. Refer to Figure 2-1.
• Select a readily accessible position for the analyzer to allow for routine
maintenance. Comfort levels for maintenance personnel should be consid-
ered in placement of the analyzer and Display User Interface.
• The installation location should be free from excessive vibration and
the ambient temperature is required to be within the limits listed in the
specications. If the ambient temperature is outside the specied limits
or the vibration is excessive, contact your AMETEK representative to dis-
cuss solutions and special options to address ambient temperatures.
• Power Requirements
The 3050-DO is shipped according to the customer order and is fused and
set for the voltage of the required mains power. The power requirements
are stated on the metal plate on the analyzer enclosure and in the Speci-
cation chapter in this manual.