34 | IPS-4 Zone1/Analyzer
Installing the Calibration (Span) Fluid Line (Optional)
For applications that require spanning, the Span fluid line is supplied by
the customer. The line must be 1/4” 316 stainless steel tubing. Refer to the
customer-specific Flow Diagram in the “Supplemental Information” tab of
this manual or the Documentation Package shipped with the analyzer.
To install the Span fluid line:
1. Route the line from the calibration fluid supply to the analyzer.
2. Before connecting it to the analyzer, blow down (purge) the line to
remove any liquids or particulate that may be present in it.
3. Connect the line to the calibration fluid supply and to the analyzer.
The plumbing for the calibration fluid feed through the analyzer
manifold is already made by AMETEK.