EasyManuals Logo

Applied Biosystems ViiA 7 Real User Manual

Applied Biosystems ViiA 7 Real
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
15
Maintain the ViiA
7 System
Applied Biosystems ViiA
7 Real-Time PCR System Quick Reference Guide
Maintain the ViiA
7 System
Maintenance schedule
Accessories required for instrument maintenance
384-well sample block
Applied Biosystems ViiA
7 System 384-Well/Array Card Heated Cover (PN 4453555)
Applied Biosystems ViiA
7 System 384-Well Plate Adapter (PN 4457087)
Applied Biosystems ViiA
7 System 384-Well Sample Block (PN 4453553)
Array card sample block
Applied Biosystems ViiA™ 7 System 384-Well/Array Card Heated Cover (PN 4453555)
Applied Biosystems ViiA™ 7 System Array Card Adapter (PN 4454166)
Applied Biosystems ViiA™ 7 System Array Card Sample Block (PN 4453554)
96-well sample block
Applied Biosystems ViiA
7 System 96-Well Heated Cover (PN 4453560)
Applied Biosystems ViiA
7 System 96-Well Plate Adapter (PN 4459845)
Applied Biosystems ViiA
7 System 96- Well Sample Block (PN 4453556)
Frequency Task
Weekly Check the computer disk space. If necessary, archive or back up your experiment files.
Power off the computer that controls the instrument, wait 30 seconds, then power on the
computer.
Clean the surface of the instrument with a lint-free cloth.
IMPORTANT! Do not use organic solvents to clean the ViiA
7 System.
Perform a ViiA
7 System self test.
Monthly Check the lamp status. If necessary, replace the tungsten halogen lamp.
Perform a background calibration.
You can perform a background calibration to check for contamination. If any parts of the optics are replaced or moved, you must run an ROI calibration,
a background calibration, a uniformity calibration, a dye calibration, a normalization calibration, and an RNase P instrument verification run.
Run disk cleanup and disk defragmentation.
Semi-annually (6 Months) Check the lamp status. If necessary, replace the tungsten halogen lamp.
Perform a regions of interest (ROI) calibration.
Perform a background calibration.
Perform an uniformity calibration.
Perform a dye calibration.
Perform a normalization calibration.
Perform an RNase P instrument verification run.
As needed Decontaminate the instrument.
Replace the tungsten halogen lamp.
Replace the fuses.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems ViiA 7 Real and is the answer not in the manual?

Applied Biosystems ViiA 7 Real Specifications

General IconGeneral
BrandApplied Biosystems
ModelViiA 7 Real
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals