EasyManua.ls Logo

Arjo 2000 - Page 32

Arjo 2000
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
4 Take the black stop ring from the plastic bag and attach.
Make sure the stop peg is positioned according to the
illustration. Attach o-ring found in the plastic bag.
(See fig. 4)
5 Take the knob from the plastic bag.
Push the knob on to the water temperature adjustment.
Make sure the stop peg under the knob is placed right
above the stop peg on the black stop ring. This will pre-
vent the knob turning counterclockwise past the end of
the preset hot water temperature. (See fig. 5)
6 Turn the knob to cold and then back to maximum preset
value and check the set temperature value.
7 From the plastic bag take out the screw and plug. Tighten
the knob with screw and cover with plug. (See fig. 6)
Fig. 5
Fig. 6
stop peg
stop peg
Fig. 4

Related product manuals