Page 44
Here you can see we have made the COMP connection
between TAG strip position 11 and the ECF80 board
COMP.
Now we have made all seven connections – it is well worth
double-checking this section – we will be doing some ohm
checks shortly also to make sure all is well.
With the inter-wiring complete you can secure down the
Hardwired EL34 board to the chassis and then secure the
ECF80 board into position also.
Well done – we have completed a channel.