EasyManua.ls Logo

Baudoulin 6 M26.2 - Page 84

Baudoulin 6 M26.2
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 2/6 -
00374 - Edition 01 - September 11
Maintenance
D400 - Maintenance operations
After 400 hours (P1 Service)
After 300 hours (P2 Service)
M1
Non-contractual illustrations
PR Catalogue
see chapters
03
04
05
b Electric pump (option): use the electric pump, with the
engine switched off, to change the oil.
b Check that the 3-way valve is in "Oil change" position as
indicated below.
b Check that the "Pump" switch is in position 1.
b Turn the "Oil change" switch of the control cabinet to "ON"
until the engine oil change is complete.
b When the oil change is complete, turn the "Oil change"
switch of the control cabinet to "OFF".
b Reposition the 3-way valve to "Pre-greasing" position.
b Fill the engine casing with oil
Control cabinet
Pre-greasing
switch
Drain Switch
Pump switch
Sump pump
Pre-greasing
Oil change
Fuse
Bridge panel

Related product manuals