Installation GRS105/GRS106
Release
01
11/2021
39
6Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following work steps to install the device:
Checking the package contents
Installing the SD card (optional)
Installing an SFP transceiver (optional)
Installing the device
Grounding the device
Connecting the terminal blocks
Connecting data cables
Filling out the inscription label
Note: Note the safety instructions in “Requirements for connecting electrical
wires” on page 12.
6.1 Checking the package contents
Check whether the package includes each item named in the section
“Scope of delivery” on page 73.
Check the individual parts for transport damage.